WORK DAY AT THE FALLS 7/18

17 07 2009

I know this a bit last minute but my weekend opened up and I will be taking advantage of it by putting in some prep work in at the Falls on Saturday.  If anyone can lend a hand, for however long or short a time, please let me know and I will work around your schedule.  If you have tools such as a weed wacker, chainsaw, mower, trimmers, clippers, hands…..whatever…..bring it.  Here is the list of to-do items before the Harvest which is a little over a month away.

Work list is as follows:
ALL HOLES:Trim/Mow every hole:
#2: prehistoric looking growth along fairway, cut up and move down limbs/debris
#3: trim/thin edges of fairway, trim bottom of hill/B pin
#4: trim towards B pin, cut up/move down limbs/debris
#6: trim bottom fairway
#7: trim B pin area
#8: widen fairway/thin rough
#9: widen fairway thin rough
#10: trim hillside, and pin areas
#13: trim left side of fairway
#14: thin out area left of A pin, trim everything between A and B pin, trim behind tee area
#16: thin out/trim left side of fairway
#17: trim tee area

• Benches
• Remove down trees
• Stair work on 3,6, and 10

Tomorrow I am going to focus on #2, #6, #7, #8.
Anything above and beyond this is a bonus.

Email me at russell@whisperingfalls.net or catch me on my mobile phone @ 240-357-2370


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s




Follow

Get every new post delivered to your Inbox.